Projects
- Hancock – 9.1Mt @ 60.3% Fe JORC resource including an Ore Reserve of 1.9Mt @ 60.2% Fe targeting production in 2023
- Elizabeth Hill – Revitalizing exploration at Australia’s highest grade silver mine
- Munni Munni – Non JORC 2012 compliant resource of 24Mt @ 2.9g/t Platinum Group Element (PGE) and gold for 2.2Moz PGM
- Brockman – Huge exploration potential with DSO grade grab samples at surface
- Vivash Gorge – Borders large Iron Ore deposits with limited modern exploration
- Mexico – Three Precious metal projects in the heart of the Mexican silver belt

LatestNews
- 24 May 2023 Directors Dealings Holdings in Company
- 17 May 2023 EXERCISE OF OPTIONS AND ISSUE OF EQUITY TVR
- 05 May 2023 Renegotiation of Mallina Acquisition Conditional acquisition of Mallina
- 02 May 2023 Resource definition drilling completed at Hancock Project – Sirius Extension
- 26 Apr 2023 Maiden JORC Ore Reserves at Hancock Iron Ore Project Elizabeth Hill Update
LatestReports
LatestMedia
- 20 Feb 2023 Alien Metals focus on bringing Hancock into production
- 14 Dec 2022 Alien Metals accelerates toward production
- 14 Sep 2022 Rod McIllree, newly appointed Chairman of Alien Metals provides an overview of operations
- 28 Jun 2022 The pathway to production and beyond with Alien Metals
- 21 Jun 2022 Alien Metals' calls Vivash Gorge a 'great asset' to add to its portfolio
LatestTweets
Why Alien Metals?
2023 Production
First shipments are expected to leave Hancock in 2023
Direct Shipping Ore
Keeps operating costs down and the mine profitable even at lower iron ore prices
#1 Mining Jurisdiction
Western Australia is the safest and most politically stable jurisdiction globally
Local Infrastructure
The Pilbara produces ~30% of global iron ore and thus has excellent local infrastructure and expertise
Exploration
The potential for a major discovery to be made within the company’s various project areas is very high. Hancock, the soon to be in production direct shipping iron project in the Pilbara is the most advanced example of this with less than 75% of the overall area having been tested but already hosting more than 10mt of exploitable material
Experienced Team
Under new leadership in both the UK and Australia (IOCA) the rate of progress continues to accelerate